groundranger
Active · latest filing Oct 2026Commercial

301 West Ave

Austin, TX 78701

Amenity deck upgrades permitted at 301 West Ave

A City of Austin building permit dated October 14, 2026, covers amenity-deck work at The Independent condominiums: adding a kitchen sink and two BBQ grills and moving two existing grills. Other recent permits at 301 West Ave cover interior renovations in residential units and an existing office.

Summarized from City of Austin records · updated Oct 14, 2026

Projects
31
31 filings
Latest filing
Oct 14, 2026
since Mar 2, 2007
Largest scope
—
Listed value
—

Where this project stands

Permit active · work underway

Amenity deck: adding a new kitchen sink adding two new bbq grills and move two existing bbq grills to existing the independent condominiums

  1. AppliedJul 10, 2025
  2. IssuedOct 14, 2026
  3. WorkOct '26 – Apr '27
  4. Final inspection
20% through of the permit windowOct 14, 2026 → Apr 14, 2027

2 contacts on this project · 2 phone numbers

Permit & project history

31 projects
  1. Amenity deck: adding a new kitchen sink adding two new bbq grills and move two existing bbq grills to existing the independent condominiums

    Amenity deck: adding a new kitchen sink adding two new bbq grills and move two existing bbq grills to existing the independent condominiums

    City of Austin permitBuilding PermitActive
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Primary bathroom guest bathroom and powder bathroom renovations including electrical fixtures and flooring throughout the unit. no structural or exterior work is proposed- suite 5402

    Primary bathroom guest bathroom and powder bathroom renovations including electrical fixtures and flooring throughout the unit. no structural or exterior work is proposed- suite 5402

    City of Austin permitElectrical PermitActive
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Primary bathroom guest bathroom and powder bathroom renovations including electrical fixtures and flooring throughout the unit. no structural or exterior work is proposed- suite 5402

    Primary bathroom guest bathroom and powder bathroom renovations including electrical fixtures and flooring throughout the unit. no structural or exterior work is proposed- suite 5402

    City of Austin permitPlumbing PermitActive
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  4. Install one illuminated double sided monument sign for the independent

    Install one illuminated double sided monument sign for the independent

    City of Austin permitElectrical PermitActive
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  5. Primary bathroom guest bathroom and powder bathroom renovations including electrical fixtures and flooring throughout the unit. no structural or exterior work is proposed- suite 5402

    Primary bathroom guest bathroom and powder bathroom renovations including electrical fixtures and flooring throughout the unit. no structural or exterior work is proposed- suite 5402

    City of Austin permitBuilding PermitActive
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  6. Non-structural interior remodel - floodplain and unit 5803 needs to be added to addressing

    Non-structural interior remodel - floodplain and unit 5803 needs to be added to addressing

    City of Austin permitMechanical PermitActive
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  7. Combining two adjacent residential units (suites 4406 and 4407) demolition and remodel of interior finishes

    Combining two adjacent residential units (suites 4406 and 4407) demolition and remodel of interior finishes

    City of Austin permitPlumbing PermitActive
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  8. Non-structural interior remodel - floodplain and unit 5803 needs to be added to addressing

    Non-structural interior remodel - floodplain and unit 5803 needs to be added to addressing

    City of Austin permitPlumbing PermitActive
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  9. Interior remodel of existing office to include access control system for unit 120

    Interior remodel of existing office to include access control system for unit 120

    City of Austin permitMechanical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  10. Interior remodel of existing office to include access control system for unit 120

    Interior remodel of existing office to include access control system for unit 120

    City of Austin permitElectrical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  11. Combining two adjacent residential units (suites 4406 and 4407) demolition and remodel of interior finishes

    Combining two adjacent residential units (suites 4406 and 4407) demolition and remodel of interior finishes

    City of Austin permitElectrical PermitActive
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  12. Udpate existing tub into a shower in guest bathroom new flooring tile counter top new countertop in kitchen. [qt]

    Udpate existing tub into a shower in guest bathroom new flooring tile counter top new countertop in kitchen. [qt]

    City of Austin permitPlumbing PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  13. Remodel master and hall bathroom vanities floors showers and fixtures

    Remodel master and hall bathroom vanities floors showers and fixtures

    City of Austin permitElectrical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  14. Amenity deck: adding a new kitchen sink adding two new bbq grills and move two existing bbq grills to existing the independent condominiums

    Amenity deck: adding a new kitchen sink adding two new bbq grills and move two existing bbq grills to existing the independent condominiums

    City of Austin permitPlumbing PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  15. Udpate existing tub into a shower in guest bathroom new flooring tile counter top new countertop in kitchen. [qt]

    Udpate existing tub into a shower in guest bathroom new flooring tile counter top new countertop in kitchen. [qt]

    City of Austin permitBuilding PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  16. Non-structural interior remodel - floodplain and unit 5803 needs to be added to addressing

    Non-structural interior remodel - floodplain and unit 5803 needs to be added to addressing

    City of Austin permitElectrical PermitActive
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  17. Remodel master and hall bathroom vanities floors showers and fixtures

    Remodel master and hall bathroom vanities floors showers and fixtures

    City of Austin permitPlumbing PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  18. Remodel master and hall bathroom vanities floors showers and fixtures

    Remodel master and hall bathroom vanities floors showers and fixtures

    City of Austin permitBuilding PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  19. Interior remodel of existing office to include access control system for unit 120

    Interior remodel of existing office to include access control system for unit 120

    City of Austin permitBuilding PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  20. Non-structural interior remodel - floodplain and unit 5803 needs to be added to addressing

    Non-structural interior remodel - floodplain and unit 5803 needs to be added to addressing

    City of Austin permitBuilding PermitActive
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  21. Project scope includes: safe excavation from outside the foundation to the offset assuming no interior beam penetrations reinforcement of the foundation where necessary along with engineering letter to verify structural integrity removal and disposal of existing pipe installation of properly sloped and sized pvc drain lines with riser clamps and anchors into the foundation city permits tests and inspections backfill tunnel and haul away additional dirt

    Project scope includes: safe excavation from outside the foundation to the offset assuming no interior beam penetrations reinforcement of the foundation where necessary along with engineering letter to verify structural integrity removal and disposal of existing pipe installation of properly sloped and sized pvc drain lines with riser clamps and anchors into the foundation city permits tests and inspections backfill tunnel and haul away additional dirt

    City of Austin permitPlumbing PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  22. Demolition/remodel of the current pool at the independent for multi-family use

    Demolition/remodel of the current pool at the independent for multi-family use

    City of Austin permitElectrical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  23. Combining two adjacent residential units (suites 4406 and 4407) demolition and remodel of interior finishes

    Combining two adjacent residential units (suites 4406 and 4407) demolition and remodel of interior finishes

    City of Austin permitMechanical PermitActive
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  24. Combining two adjacent residential units (suites 4406 and 4407) demolition and remodel of interior finishes

    Combining two adjacent residential units (suites 4406 and 4407) demolition and remodel of interior finishes

    City of Austin permitBuilding PermitActive
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  25. Demolition/remodel of the current pool at the independent for multi-family use

    Demolition/remodel of the current pool at the independent for multi-family use

    City of Austin permitBuilding PermitActive
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  26. Removal and replacement of 9th floor dog park turf topping slab and repair waterproofing on structural slab. the dog park area is 20ft x 34ft

    Removal and replacement of 9th floor dog park turf topping slab and repair waterproofing on structural slab. the dog park area is 20ft x 34ft

    City of Austin permitBuilding PermitExpired
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  27. Installation of 10 ev chargers

    Installation of 10 ev chargers

    City of Austin permitBuilding PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  28. Installation of 10 ev chargers

    Installation of 10 ev chargers

    City of Austin permitElectrical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  29. Remove and replace areas drywall for the retro-fit of the fire suppression system

    Remove and replace areas drywall for the retro-fit of the fire suppression system

    City of Austin permitBuilding PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  30. Block 24

    City of Austin casesite_planApproved and Released
    Record
    11224270
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  31. ENERGY MANAGEMENT AND CONTROL CENTER

    Energy management and control center

    City of Austin casesite_planClosed
    Record
    149835
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 301 West Ave

What is being built at 301 West Ave?

A permit dated October 14, 2026, covers updates to The Independent condominiums’ amenity deck, including a new kitchen sink and two BBQ grills. Two existing grills will also be moved.

When was the amenity deck work at 301 West Ave permitted?

The City of Austin permit, 2025-125844 BP, is dated October 14, 2026.

Are new BBQ grills being added at The Independent?

Yes. Permit 2025-125844 BP describes adding two BBQ grills to the amenity deck and moving two existing grills.

What renovations are permitted at 301 West Ave?

Recent permits include bathroom and flooring renovations in suite 5402, work combining residential suites 4406 and 4407, and a non-structural interior remodel in unit 5803.

What's happening at 301 West Ave near Bodyrok Austin at Seaholm?

The address is about 81 meters from Bodyrok Austin at Seaholm. A permit for The Independent condominiums’ amenity deck covers a new kitchen sink, two BBQ grills and relocating two existing grills.

What's happening at 301 West Ave near Merit Coffee?

Merit Coffee at 222 West Ave is about 109 meters away. At 301 West Ave, a permit dated October 14, 2026, covers amenity-deck upgrades at The Independent condominiums.

Also being built nearby

All of 78701

More apartments & multifamily in 78701, demolitions in 78701, offices in 78701.

Email me when it passes final inspection