4425 FM 2931
Aubrey, TX 76227 · Reflection Park, Aubrey Fire Station #3 And Police Substation Construction
Reflection Park memorial plaza and sidewalk in Aubrey
A small memorial plaza with a memorial sign, planting, irrigation and about 130 feet of sidewalk is being installed south of the existing fire station at 4425 FM 2931. The project was registered with TDLR on October 14, 2026; its status is listed as inspection complete.
Summarized from Texas Department of Licensing and Regulation records · updated Oct 14, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Oct 14, 2026
- since Oct 14, 2026
- Largest scope
- 2,000 sf
- Estimated cost
- $7.0M
- state registration
Where this project stands
Inspected · closing outReflection Park
2,000 sq ft · $111K est.
- RegisteredOct 14, 2026
- Plan review
- ConstructionAug '26 – Nov '26
- Inspected
- Closednow
The building is substantially done. Move-in, fit-out and service work usually follow.
4 contacts on this project · 3 phone numbers
Permit & project history
2 projectsA small memorial plaza with a memorial sign are being installed south of existing fire station with approx. 130lf of sidewalk to connect to the existing parking lot with planting and irrigation. — reflection park
TDLR project registrationAdditions to Existing BuildingInspection Complete2,000 sq ft$111K est.- Project #
- TABS2027003520
- Tenant / owner
- Reflection Park
- Design firm
- Pro
- Contact
- Pro
New fire station and police substation. site improvements — aubrey fire station #3 and police substation
TDLR project registrationNew ConstructionInspection Complete12,000 sq ft$7.0M est.- Project #
- TABS2023025917
- Tenant / owner
- Aubrey Fire Station #3 And Police Substation Construction
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 4425 FM 2931
What is being built at 4425 FM 2931 in Aubrey?
A small memorial plaza with a memorial sign is being installed south of the existing fire station. The project also includes about 130 feet of sidewalk connecting to the existing parking lot, along with planting and irrigation.
When was the Reflection Park project registered?
The TDLR project registration, TABS2027003520, was filed on October 14, 2026. Its status is listed as inspection complete.
How much sidewalk is part of the Reflection Park project?
The project description calls for about 130 linear feet of sidewalk connecting the plaza to the existing parking lot.
What is the estimated cost of Reflection Park in Aubrey?
The TDLR registration lists an estimated project cost of $110,500. This is the applicant's estimate for the project.
Is Reflection Park near Palomino on FM 2931?
Yes. The project address is about 320 meters from Palomino at 4621 FM 2931.
Also being built nearby
All of 76227- 4621 FM 2931 · Drp Greenbough 76, LLCJun 1, 2026Palomino — new construction — 28 bfr's and 22, 802 sq ft sidewalk · 320 m away
- 4839 FM 2931 · Aubrey 2931 Investments LPNov 15, 2024Aubrey fm 2931 storage — new construction — self storage facility with 3 stories and grade entry basement and manager's office, all climate control and automatic fire sprinkler system · 549 m away