5801 W. Interstate 20

Arlington, TX 76017 · Palm Beach Tan Arlington, Moss Chiropractic - Tfo + 1 more

Two Green Oaks Plaza suites registered for renovation

TDLR records show interior renovations planned for two suites at Green Oaks Plaza: Palm Beach Tan Arlington’s 2,070-square-foot suite, registered June 18, 2026, and Moss Chiropractic’s 1,500-square-foot suite, registered July 9, 2025. The work described includes a retail-suite renovation for Palm Beach Tan and new offices, adjustment areas, and an X-ray room for Moss Chiropractic.

Summarized from Texas Department of Licensing and Regulation records · updated Jun 18, 2026

Projects
3
3 filings
Latest filing
Jun 18, 2026
since Jul 9, 2025
Largest scope
2,070 sf
Estimated cost
$285K
state registration

Where this project stands

Finishing up · inspection next

PALM BEACH TAN ARLINGTON

2,070 sq ft · $225K est.

  1. RegisteredJun 18, 2026
  2. Plan review
  3. ConstructionJul '26 – Oct '26
  4. Inspectednow
  5. Closed

Scheduled to finish Oct 20, 2026; the state inspection hasn't been filed yet.

4 contacts on this project · 4 phone numbers

Permit & project history

3 projects
  1. Interior renovation of retail suite — green oaks plaza

    TDLR project registrationRenovation/AlterationReview Complete2,070 sq ft$225K est.
    Tenant / owner
    Palm Beach Tan Arlington
    Design firm
    Pro
    Contact
    Pro
  2. Demolition existing space and install new offices, adjustment areas, and x-ray room. restroom to be brought up to code. — green oaks plaza

    TDLR project registrationRenovation/AlterationProject Closed1,500 sq ft$151K est.
    Tenant / owner
    Moss Chiropractic - Tfo
    Design firm
    Pro
    Contact
    Pro
  3. ISI Elite Training

    Interior alteration with new walls, ceilings, finishes, hvac, plumbing and electrical — green oaks plaza

    TDLR project registrationRenovation/AlterationProject Closed3,281 sq ft$285K est.
    Tenant / owner
    Isi Elite Training
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 5801 W. Interstate 20

What is being built at 5801 W. Interstate 20 in Arlington?

TDLR records describe renovations to two suites in this multi-tenant property: a retail-suite renovation for Palm Beach Tan Arlington and an office and treatment-area buildout for Moss Chiropractic.

Is Palm Beach Tan opening at 5801 W. Interstate 20?

A TDLR registration dated June 18, 2026, lists an interior renovation of a 2,070-square-foot retail suite for Palm Beach Tan Arlington. The record does not give an opening date.

What work is planned for the Moss Chiropractic suite?

The July 9, 2025, TDLR registration describes demolishing the existing space and installing offices, adjustment areas, and an X-ray room, with the restroom brought up to code. The project is listed as closed.

How much is the Palm Beach Tan renovation estimated to cost?

The TDLR registration lists an applicant-estimated cost of $225,000 for the Palm Beach Tan suite renovation. This is an estimate for that project, not a total cost for the property.

What is being renovated near Blaze Bowl on W. Interstate 20?

At 5801 W. Interstate 20, 34 meters from Blaze Bowl at 5821 W. I-20, TDLR records describe renovations for Palm Beach Tan Arlington and Moss Chiropractic in Green Oaks Plaza.

Is 5801 W. Interstate 20 a single-tenant building?

No. The property is identified as multi-tenant, and the records describe separate projects for Palm Beach Tan Arlington and Moss Chiropractic.