1818 E. Pioneer Pkwy
Arlington, TX 76010 · Hkt Management Corporation
400-square-foot stage planned at Central Public Plaza
A 400-square-foot stage is planned at Central Public Plaza, 1818 E. Pioneer Pkwy in Arlington. A Texas Department of Licensing and Regulation project registration dated April 14, 2026, lists the work as new construction and shows a status of Review Complete.
Summarized from Texas Department of Licensing and Regulation records · updated Apr 14, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Apr 14, 2026
- since Apr 14, 2026
- Largest scope
- 400 sf
- Estimated cost
- $120K
- state registration
Where this project stands
Finishing up · inspection nextCentral Public Plaza
400 sq ft · $120K est.
- RegisteredApr 14, 2026
- Plan review
- ConstructionApr '26 – Jul '26
- Inspectednow
- Closed
Scheduled to finish Jul 31, 2026; the state inspection hasn't been filed yet.
4 contacts on this project · 2 phone numbers
Permit & project history
1 projectTo construct a 400 sq ft stage. — hkt management corporation
TDLR project registrationNew ConstructionReview Complete400 sq ft$120K est.- Project #
- TABS2026017599
- Tenant / owner
- Central Public Plaza
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 1818 E. Pioneer Pkwy
What is being built at 1818 E. Pioneer Pkwy?
A 400-square-foot stage is planned at Central Public Plaza. The TDLR registration, filed April 14, 2026, identifies the work as new construction.
When was the Central Public Plaza stage project registered?
The project registration was filed on April 14, 2026. Its TDLR status is Review Complete.
How much will the Central Public Plaza stage project cost?
The TDLR registration lists an estimated project cost of $120,000. This is the applicant's estimate, not a confirmed final cost.
What is the status of the stage project at 1818 E. Pioneer Pkwy?
The TDLR registration lists the status as Review Complete. It describes construction of a 400-square-foot stage.
What's being built near Signaturecare Arlington FEMC Renovation?
A 400-square-foot stage is planned at Central Public Plaza, about 352 meters from the Signaturecare Arlington FEMC Renovation site at 1811 E. Arkansas Lane. The stage project was registered with TDLR on April 14, 2026.
What construction is planned near the Arlington Police Sub-Station at 2001 New York Ave?
Central Public Plaza has a TDLR registration for a new 400-square-foot stage at 1818 E. Pioneer Pkwy, about 425 meters away. The registration was filed April 14, 2026.
Also being built nearby
All of 76010- 2101 Browning Drive, Arlington, TX 76010 · Arlington ISDFeb 19, 2025Dan dipert ctc addition — additions to existing building — new storm shelter and classroom addition · 322 m away
- 2101 Browning Drive · Arlington Independent School DistrictMay 22, 2024Arlington isd ctc north drive replacement — renovation/alteration — replacement of an existing driveway and sidewalk · 322 m away
- 1811 E. Arkansas Lane · Tyche Arlington Holdings LLCSep 14, 2026Signaturecare arlington femc renovation — renovation/alteration — renovation of an existing retail building into a freestanding emergency medical care facility (femc), including associated site improvements · 352 m away
- 2021 New York Ave · St. Matthew Catholic ChurchJul 23, 2024Kitchen renovation-st. matthew catholic church — renovation/alteration — renovation of existing kitchen -1,727 sq ft, including addition of walk-in cooler/freezer, demolition and reconstruction of numerous walls and replacement of cooking and prep equipment. new construction of exterior ramp (non-exiting) · 402 m away
- 2001 New York Ave · City Of ArlingtonApr 20, 2026Arlington police sub-station reroof and widow replacement — renovation/alteration — removal and replacement of approximately 7,800 square feet of the existing modified bitumen roofing system. replacement of exterior storefront and curtain wall systems, including storefront doors · 425 m away
- 1900 Oleander Dr · Arlington ISDFeb 11, 2026Aisd 2019ph4 rankin elementary school renovations — renovation/alteration — sprinkler upgrade in old wing of school. extensive restroom renovations. new ceilings and lights throught school. paint · 556 m away
- 1421 Adell Rose LnJul 23, 2024Single-family residence with attached garage · 570 m away
- 1419 Adell Rose LnJan 19, 2021Single-family residence - att gar (repeat - 2661 b) · 574 m away
- 1417 Adell Rose LnJan 19, 2021Single-family residence - att gar (repeat - 2622 b) · 579 m away
- 1415 Adell Rose LnFeb 2, 2021Single-family residence - att gar (repeat - 2671 b) · 594 m away